Skip to content
BRIX

Work method statement / PPR

Price on request
with delivery

Description

Work method statement / PPR is a professional service for B2B orders, project preparation and work performed under an agreed technical assignment. The position is related to: design, engineering surveys, geodesy, technical calculations, inspections and preparation of documentation. It is used when a customer needs to organize work, obtain a technical result, prepare documentation or close a specific stage of a project without adding unverified parameters to the request. The scope of Work method statement / PPR depends on the site, source data, customer requirements and actual execution conditions. Before placing an order, it is recommended to clarify the work scope, site address or parameters, expected result format, approval procedure, documentation requirements, site access and responsibilities of the parties. For design, installation, service and engineering tasks, the request should be supported by a technical assignment, drawings, schemes, project data or a description of the issue when available. Expected result: design, calculation or permitting documentation within the agreed scope. On BRIX, this position can be used to compare contractors, prepare a request and agree on execution terms. The description explains the purpose of the service, its area of application and the parameters that should be clarified before ordering, without unsupported warranties, standards, brands or excessive advertising wording.

Specifications

Item type
Service
Work type
Work method statement / PPR
Application area
design, engineering surveys, geodesy, technical calculations, inspections and preparation of documentation
Execution basis
technical assignment, project data or customer request
Result
design, calculation or permitting documentation within the agreed scope
Unit of measure
service

YOU MAY ALSO LIKE

Electrical power supply design
Electrical power supply design
Price on request
BRIX Supplier
HVAC design
HVAC design
Price on request
BRIX Supplier
Structural strengthening
Structural strengthening
Price on request
BRIX Supplier
Foundation calculation
Foundation calculation
Price on request
BRIX Supplier
Seismic resistance calculation
Seismic resistance calculation
Price on request
BRIX Supplier
Steel structure calculation
Steel structure calculation
Price on request
BRIX Supplier
Insolation calculation
Insolation calculation
Price on request
BRIX Supplier
BIM modeling in Revit
BIM modeling in Revit
Price on request
BRIX Supplier